With the B Shift I made a fire today
in a garage after lighting caught the attic on fire. They cut a hole into the roof for ventilation. Then we opened the ceiling of the garage, which was used as a kind of office, and put out the fire which was located right between the garage wall and the roof. Afterwards we covered the holes in the roof with plastic foil in order to protect the inside from rain.
Montag, 3. September 2007
Day 15 – Schnitzel Time
Abonnieren
Kommentare zum Post (Atom)
Keine Kommentare:
Kommentar veröffentlichen